一、玻璃钢管道(FRP pipe)与机器连接(Connect)前,应避免强力相对,在自由状态下检查法兰的平行度和同轴度。 二、安全阀应垂直安装(install),在投入试运行时,要及时调校安全阀。安全阀的调校在系统长进行,开启和回座压力要契合设计文件的规定。 三、仪表元件的临时替换:一切仪表元件安装(install)时,均采用临时元件替换,等试压、冲刷、吹扫工作结束后,投料前再正式安装(install)。 四、阀门安装(install)前,按设计文件核对其型号,并按介质流向肯定其安装(install)方向。当阀门与管道以法兰或螺纹方式连接(Connect)时,阀门应在关闭状态下安装(install);如以焊接方式安装(install)时,阀门不得关闭。 1. Before the connection of the pipeline and the machine, the relative strength should be avoided, and the parallelism and coaxiality of the flange should be checked in the free state. Two, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents. Three, the temporary replacement of instrument components: all instrument components are installed with temporary components. After the end of test pressure, flushing and blowing, the installation is formally installed before the feeding. Four. Before installing the valve, check its model according to the design document and deter分钟e its installation direction according to the medium flow direction. When the valve and pipe are connected by flange or thread, the valve should be installed in the closed state; if the welding method is installed, the valve must not be closed.
厂家专业生产玻璃钢化粪池,模压化粪池,SMC化粪池,生物化粪池,玻璃钢管道,玻璃钢除尘净化设备,玻璃钢脱硫塔,玻璃钢净化塔,玻璃钢电缆桥架,玻璃钢电缆支架,玻璃钢格栅,玻璃钢水箱等各类玻璃钢产品,本公司生产的玻璃钢类产品价格优惠,品种齐全。欢迎新老客户前来洽谈合作!
评论